Careers

Instructional Design Contract Work: Unsigned, the Course Is Yours

In US law a commissioned course becomes the client's work for hire only if both sides sign a written agreement saying so. Here's how a contract project runs, and where that signature belongs.

A woman with long light-brown hair and round glasses, in a denim shirt over a striped T-shirt, smiles as she types on a laptop at a timber desk, in a studio office with a painted brick wall, shelves of folders and a pegboard
Photo: silverkblack / Pexels
The short answer

Instructional design contract work is a defined project for a client: you agree the scope, price and deliverables in writing, build in phases with sign-offs, then hand over the files. The clause most often missed is ownership. Under US and Australian copyright law, a genuine contractor generally owns what they create unless a signed written agreement says otherwise.

Key takeaways

  • A contract project runs in six steps: confirm it's genuinely a contract, scope it, price it, put it in writing, build with sign-offs, and hand over.
  • Under US law, a commissioned instructional work is a work made for hire only if both parties sign a written agreement that expressly says so; otherwise copyright starts with its author.
  • In Australia, outside a few listed categories, the author owns copyright in a commissioned work, and ownership can be assigned in writing.
  • The label on the contract doesn't settle whether you're a contractor: the IRS looks at control over the work, and Australia's regulators are targeting sham contracting.
  • In a 2020 ATD survey of learning professionals, scope creep was one of four barriers to faster development each cited by 34 to 39 per cent of full respondents, so write down what's out of scope too.

Instructional design contract work is a defined job for a client: you agree what you’ll build, for how much and by when, build it in stages the client signs off, and hand it over. Most of that is project management. The part designers most often leave vague is the one that decides who owns the result.

In the US, a course you’re commissioned to build counts as the client’s “work made for hire” only if you both sign a written agreement that expressly says so (US Copyright Office, 2024). Without one, copyright starts with the author, and a later transfer has to be in writing and signed (17 U.S.C. 201 and 204). Australia’s default runs the same way for most commissioned work (Legal Services Commission of South Australia). That applies to genuine contractors, not employees, and it’s a default, not advice on your own contract. But it means a handshake deal can leave a client paying for a course it doesn’t own, and a designer holding rights nobody meant them to have.

This guide walks through a contract project in six steps, with an example at each, and shows where that ownership clause belongs. If you’re still looking for the work itself, start with our guide to part-time instructional design jobs, which covers where contracts and freelance clients come from.

1. Check it’s genuinely a contract

“Contractor” is a description of how the work happens, not a word you can put on the paperwork and make true. In the US, the Internal Revenue Service looks at the whole relationship under the common law, in three groups of evidence: behavioural control (whether the business has “a right to direct and control what work is accomplished and how the work is done”), financial control (who pays expenses, who supplies the tools, whether the worker can make a profit or loss), and the type of relationship (benefits, permanence, and whether the work is a key part of the business) (IRS, Topic 762). If it’s still unclear, either side can ask the IRS to decide using Form SS-8, though the IRS warns it “may take at least six months” to get an answer (IRS).

In Australia, the Fair Work Ombudsman puts it plainly: “It’s illegal to represent to a worker that they’re a contractor when the business doesn’t reasonably believe this” (Fair Work Ombudsman). In March 2026 the Ombudsman and the Australian Taxation Office said they were “ramping up their focus on sham contracting”, with the ATO matching contractor payment reports against tax returns, ABN records, super and payroll data (FWO and ATO, 2026).

This matters to designers for a second reason. The employee half of the US work-for-hire rule depends on whether the work was made within the scope of employment, judged by the same kind of common-law test (US Copyright Office, 2024). How the relationship really works affects tax, entitlements and who owns the course.

Example: a university offers a designer a “contract” to work 38 hours a week for a year, on its laptop, to its timetable, reporting to a team lead. That looks more like fixed-term employment than a contract project, whatever the document calls it. A project to rebuild four modules by March, using her own equipment and schedule, for a set fee, looks like contract work.

2. Scope the project before you price it

Scope is the list of what you’ll deliver, and it’s where contract projects go wrong. In a 2020 ATD survey of learning development professionals, limited resources (time, talent and money) were the most common barrier to developing content faster, cited by 67 per cent of the 112 people who answered every question. Scope creep, defined as “expanding project deliverables”, was one of four further barriers each cited by between 34 and 39 per cent (Defelice, 2021). The others were a lack of standard processes or templates, subject matter experts and stakeholders who weren’t available, and limited tools and systems. Two of those four are about the client’s side of the project, which a contract can address.

The same study also makes a point about estimating. It asked about the time to build whole units of training, not an “hour of training”, because, as the author put it, units “are rarely an hour long”. Estimate from the units you’ll actually deliver, and from your own past projects, rather than a generic ratio of development hours per hour of learning.

A useful scope names:

  • The deliverables and their format: “six eLearning modules of 10 to 15 minutes, built in the client’s authoring tool and published as SCORM packages for its LMS”, not “an online course”.
  • What’s out of scope: voice-over recording, translation, LMS set-up, accessibility remediation of the client’s existing documents. Writing these down is how you price them later.
  • The client’s commitments: a named subject matter expert, how quickly they’ll review drafts, and who has final sign-off.
  • The review rounds: how many rounds of changes each deliverable includes.

Example: a training company asks for “a compliance course”. The designer’s scope document turns that into a 30-minute module with a ten-question final quiz, two review rounds per stage, the compliance manager as sole approver, and source content supplied by the client within a week.

3. Choose how to charge

There’s no reliable public data on how instructional design contractors price their work, so this section is our judgement rather than a finding. Three models cover most projects:

  • Hourly or daily rates suit work whose size you can’t see yet: fixing an existing course, open-ended support, or a placement inside the client’s team. The client carries the risk of overruns; you need to log time.
  • A fixed price per project suits a well-defined build. You carry the risk, so it only works when the scope from step 2 limits the deliverables and review rounds.
  • Staged pricing splits the difference: a fixed fee for analysis and design (the learner brief, objectives, outline and storyboard), then a separate quote for the build once both sides can see it. It suits clients who can’t yet say what they need.

Whichever you choose, your rate has to cover the hours you won’t bill: quoting, admin, chasing payment, software licences, insurance, tax and leave. Our guides to part-time instructional design jobs and instructional designer salary give survey figures on what freelance and employed designers earn, as a starting point for your own sums.

Example: for the compliance module, the designer quotes a fixed fee for the analysis and storyboard, payable on sign-off, and a second fixed fee for the build. When the client later asks for a Spanish version, it’s already listed as out of scope, so it becomes a new quote rather than an argument.

4. Put it in writing, including who owns the course

The usual document is a contract plus a statement of work (SOW) that holds the project detail. Most clauses are business terms: price, payment schedule, timeline, sign-off points, cancellation, confidentiality. The one that’s easy to skip, and hard to fix later, is ownership.

Under US law, a commissioned work can only be a work made for hire if it falls into one of nine categories, and one of them is “an instructional text”: “a literary, pictorial, or graphic work prepared for publication and intended for use in systematic instructional activities” (US Copyright Office, 2024). Other parts of a course, such as its video, may fit other categories, including “a part of a motion picture or other audiovisual work”. But all four of the circular’s conditions have to be met: an eligible category, a written agreement, express work-for-hire wording, and signatures from everyone. If any one fails, the circular says, “it is not a work made for hire.”

When a work isn’t made for hire, copyright starts with its author. A client can still own it by assignment, but the Act says a transfer of ownership, “other than by operation of law, is not valid unless” it is in writing and signed by the owner of the rights or their agent (17 U.S.C. 204).

In Australia, the general rule is that the author owns copyright, and the employer owns work made in the course of employment. For commissioned work, the Law Handbook notes exceptions for some categories, such as commissioned private photographs, portraits, sound recordings and films; “In all other cases of commissioned works however, the author owns copyright.” Ownership can be changed by agreement or assigned in writing (Legal Services Commission of South Australia). The page was last revised in 2016, so check the current Copyright Act or a lawyer before relying on it. If you work elsewhere, check your own country’s rules.

In practice, we’d make the ownership clause answer five questions:

  1. Who owns the finished course: the client, by an assignment or a work-for-hire clause, or you, with a licence to the client?
  2. When ownership passes: on signing, or on final payment? Tying it to payment protects you if an invoice goes unpaid.
  3. Which files are included: the published course only, or the editable source files, storyboards and scripts too?
  4. What you keep: your own templates, interaction patterns and tools you built before the project. Name them, so a client doesn’t end up owning your starter kit.
  5. Whether you can show the work in your portfolio, and with what removed.

Third-party material sits outside all five. Stock images, music, fonts and authoring tool assets come with their own licences, and the client needs to hold or inherit the right licence to keep using them after you leave.

This is general information, not legal advice. For a large project, or a template contract you’ll use for years, pay a lawyer in your jurisdiction to review it once.

Contracts are always easy at the beginning of a job and hard at the end, so I iron out the understandings about IP ownership, partnership expectations and deliverables as early as possible, and get them approved in writing by everyone involved. Even when not all the deliverables are clear at the start, I put a heads of agreement (HOA) in place, with a set date to review it and turn it into a binding contract. When I hire through a freelance platform like Upwork, the key milestones and deliverables are built into the job brief. When I hire from an ad placed on a university website, I set firm deliverables myself, with dates for when each one is needed on mission-critical projects.

Example: a designer’s standard SOW assigns copyright in the finished modules and their source files to the client on payment of the final invoice, keeps her own interaction templates, and lets her show two screens of the course in her portfolio with the client’s name and content blurred.

5. Build in phases, with a sign-off at each

Run the build so that the client approves each stage before you start the next. The phases of the ADDIE model map neatly onto contract milestones, and each one produces something the client can sign:

  • Analysis: a short brief on the learners, the problem and how success will be measured.
  • Design: the objectives, the course outline and the assessment plan. Our guide to writing learning objectives covers the first.
  • Storyboard or script: every screen or line, approved before you build. An eLearning storyboard is the cheapest place to make changes.
  • Build and review: an alpha version for content review, then a beta for final checks, each counted against the agreed review rounds.
  • Pilot: where the budget allows, a small test with real learners before launch. Our guide to piloting a course shows how.

Sign-offs protect both sides. When a reviewer asks to restructure module two after the storyboard was approved, the sign-off shows it’s a change, and the SOW says how changes are priced.

Example: the designer sends the storyboard for the compliance module with a one-line approval request. The compliance manager approves it with three small edits. When a second manager later asks for a new scenario, the designer quotes it as a change, citing the signed storyboard.

6. Hand over and close the project

A clean handover is what earns repeat work and referrals. Agree what’s in it before the last week:

  • the published files (SCORM packages, videos, documents), tested in the client’s LMS;
  • the editable source files, if the contract includes them, with the authoring tool version noted;
  • a list of third-party assets and their licences;
  • a short maintenance note: where text lives, how to update a quiz question, what not to touch.

Then send the final invoice, confirm in writing that ownership has passed if the contract ties it to payment, and ask for the two things a freelancer’s next project depends on: permission to use the work in your portfolio, and a referral or short reference. Our instructional design portfolio examples show how to present client work once you have that permission.

Example: the designer delivers the packages and source files in a shared folder, walks the client’s LMS administrator through the maintenance note on a 20-minute call, invoices, and asks the compliance manager whether she’d be willing to be a reference.

What to do next

Take the contract or statement of work from your last project, or the template you plan to use, and find the ownership clause. If there isn’t one, or it doesn’t say who owns the source files and when ownership passes, draft the five answers from step 4 and add them before you sign the next one.

Reader poll

Three quick questions about how you work.

Answer to see the results

1. How do you usually price contract instructional design work?
2. In your contract projects, what does the agreement say about who owns the finished course?
3. How many rounds of client review do your contracts usually include?
0 of 3 answered

Questions people ask

What is instructional design contract work?

It's instructional design done for a client under a contract rather than as an employee: building a course, converting classroom training to eLearning, or rewriting a programme for a set fee or rate. Contracts can be short projects, hourly arrangements or full-time placements for a few months. What makes it contract work is the relationship, not the hours, and tax and employment regulators look at how the work is actually controlled.

Who owns a course built by a freelance instructional designer?

It depends on the agreement and the law where you work. In the US, a commissioned instructional work is a work made for hire only if both parties sign a written agreement saying so; otherwise copyright vests in the author, and a transfer must be in writing and signed. In Australia, the author owns most commissioned works unless ownership is assigned. Get advice on your own contract.

Should I charge hourly or a fixed price for instructional design work?

Hourly suits work whose size you can't yet see, such as fixing an existing course or open-ended support. A fixed price suits a well-defined build, but only if the statement of work limits the deliverables and review rounds, because development time varies widely. Many designers quote a fixed price for analysis and design first, then price the build once the scope is clear.

What should an instructional design statement of work include?

The deliverables and their format, what's out of scope, the number of review rounds, who the subject matter expert is and how quickly they'll respond, the price and payment schedule, the timeline with sign-off points, who owns the finished work and the source files, and whether you can show the work in your portfolio.

Can I put client work in my instructional design portfolio?

Only if the contract allows it or the client agrees in writing. Once a client owns the work, showing it publicly needs their permission, and some will say no because of confidential content. Ask for portfolio rights in the statement of work, or plan to rebuild a sample with invented content that shows the same design decisions.

Sources

  1. US Copyright Office (2024). Circular 30: Works Made for Hire (revised August 2024). https://www.copyright.gov/circs/circ30.pdf
  2. US Copyright Office (1976). Copyright Law of the United States, Chapter 2: Copyright Ownership and Transfer (17 U.S.C. 201–205). https://copyright.gov/title17/92chap2.html
  3. Legal Services Commission of South Australia (2016). Who owns copyright? The Law Handbook, Copyright chapter. https://lawhandbook.sa.gov.au/ch11s06.php
  4. Internal Revenue Service (2026). Independent contractor (self-employed) or employee?. https://www.irs.gov/businesses/small-businesses-self-employed/independent-contractor-self-employed-or-employee
  5. Internal Revenue Service (2026). Topic no. 762, Independent contractor vs. employee. https://www.irs.gov/taxtopics/tc762
  6. Fair Work Ombudsman (2026). Sham contracting. https://www.fairwork.gov.au/find-help-for/independent-contractors/sham-contracting
  7. Fair Work Ombudsman and Australian Taxation Office (2026). Sham contracting in the spotlight (joint media release). https://www.fairwork.gov.au/newsroom/media-releases/2026-media-releases/march-2026/20260313-sham-contracting-media-release
  8. Defelice, R. A. (2021). How Long Does It Take to Develop Training? New Question, New Answers. Association for Talent Development (ATD). https://td.org/insights/how-long-does-it-take-to-develop-training-new-question-new-answers
Jim Lounsbury

Learning designer, documentary filmmaker and founder of The Learning Curve. Jim designs microcredentials and online courses for universities and businesses. More about Jim

Read next